/ THE IMPACT
High-Level Project Outcomes
Despite the confidentiality of the design layouts, the business and operational impact of the automation system can be shared. Re-engineering the expense validation process led to measurable improvements in efficiency:
3 Days
Reimbursement Cycle
(Down from 14 days)
-60%
Inventory Delays
(Improved site operations)
-50%
Audit Time
(Reduced financial overhead)
/ TALK POINTS
What We Can Discuss on a Call
If you are interested in the details of this project, I can walk you through the following topics during a private review session:
-
1. On-Site Contextual Inquiry
How I shadowed civil engineers on active construction sites in Bangalore to observe their daily billing challenges under dust, heat, and physical fatigue.
-
2. Offline-First Design Strategy
Building a robust upload system that handles extremely poor internet connectivity in basement construction levels without losing receipt uploads.
-
3. Complex Status Ecosystems
Mapping the 7 distinct approval states an invoice goes through between site engineer, site manager, auditor, and head office finance.
-
4. Friction-Free Receipt Upload
Leveraging intelligent OCR scan guidelines to prevent engineers from uploading blurred, cropped, or unreadable invoice pictures.